the statement and combined them into one line below corporate tax expense called “Profit for the period from discontinued operation, net of tax” (See Note 7 to our interim financial statements for the
when combined with the acquisition of assets in the period of 6 months occurred before the date of the BOD has approved the acquisition of the WPS is the acquisition of Solar Power Projects with capacity
barrels per day during late Q1/2019. However, crude oil price was supported by the production reduction of the OPEC group and their associates; combined OPEC production reduced by than 2 million barrels per
, with the pre-sale of industrial land during the fourth quarter of 2018 alone up to 746 rais, totaling 976 rais for the whole year, the Company had a large number of backlog of 654 rai as of ended 2018
. Out of the amount, sales of energy drink product alone were THB 3,247 million, up by THB 137 million or 4.4%, contributing from both domestic and overseas markets at the ratio of approximately 47:53
/Litre, lowered by 5% YoY, a result from lubricant product’s rising cost compared to their stagnant price, combined with slight dips in retail marketing margin. Marketing margin decreased 1% QoQ, from
Commonwealth of Australia. The project cost is approximately AUD 359 million. It started the construction in 2019 and is anticipated to commence operations in 2021. 1.3 The Progress of Riau Combined-Cycle Power
FINANCIAL POSITION PROGRESS OF PROJECTS UNDER CONSTRUCTION 11 Amata B.Grimm Power (Rayong) 4 Type of Fuel Combined Cycle Cogeneration Installed Capacity Electricity 133 MW / Steam 30 t/h Economic Ownership
combined cycle cogeneration power that commenced COD on June 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as