design process, in case that the contractor of new factory has a relationship in term of a connected person according to the Notification of the Capital Market Supervisory Board No. TorChor 21/ 2551 Re
design process, in case that the contractor of new factory has a relationship in term of a connected person according to the Notification of the Capital Market Supervisory Board No. TorChor 21/ 2551 Re
summary as follows:- 1. Nature of operations of the Group The Group has principally engage in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water
principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical business which dialysis
-o-y) and 2.2%(y-o-y) respectively. For the income proportion separating by business structure consisted of Aviation refueling services at 82% and Fuel pipeline transportation services at 18
Financial Position and Capital Structure As at 30 September 2019, the Company reported total assets of THB 64,808m, an increase of THB 5,878m from 31 December 2018, including THB 22,179m Current assets and
and Analysis 2019 Financial Position and Capital Structure As at 31 December 2019, the Company reported total assets of THB 67,681m, an increase of THB 8,751m from 31 December 2018, including THB
notable improvement of the performance in terms of revenue and cost-saving compared to last quarter. However, Overall performance on a year-over-year basis was affected by the change in structure of revenue
, passing Bang Pai, Bang Wa, Phasi Charoen, and Bang Kae, and ends at Kanchanapisek Road, totaling 9 kilometers of elevated structure with 7 stations. Section 3 Tao Poon Station - Tha Pra Station: within 36
(126.5) (11.5%) Net Profit Margin 28.3% 31.6% Earning per share (Bt) 1.52 1.72 (0.2) (11.5%) 2017 2016 Inc / (Dec) Page 4 of 7 For the income proportion separating by business structure consisted of