already transferred 5 units at the end of 2Q19 which currently is in the process of construction and decorations to support future demands. Central Pattana Public Company Limited Management’s Discussion and
consequence of soften advanced bookings after end of peak travel season, together with tourists' demands have been shifted to travel different destinations outside Thailand. Non-current liabilities Total non
the fuel cost with an effective allocation of power generation capacity to match the demands of each generation unit, and the costs of spare part management. 7.6 The Company will be able to accommodate
the fuel cost with an effective allocation of power generation capacity to match the demands of each generation unit, and the costs of spare part management. 7.6 The Company will be able to accommodate
, which will reduce redundancy in future investments and decrease the fuel cost with an effective allocation of power generation capacity to match the demands of each generation unit, and the costs of spare
transferred 5 units which currently is in the process of construction and decorations to support future demands. Central Pattana Public Company Limited Management’s Discussion and Analysis (MD&A) Page 4 of 15
is in the process of construction and decorations to support future demands. Central Pattana Public Company Limited Management’s Discussion and Analysis (MD&A) Page 4 of 16 Financial and Operating
is in the process of construction and decorations to support future demands. Central Pattana Public Company Limited Management’s Discussion and Analysis (MD&A) Page 4 of 15 Financial and Operating
as, demand from air travel that increased after the typhoons subsided. However, Jet fuel stock in Japan was at a high level, coupled with warmer than usual weather, leaving demands for Kerosene lower
export arbitrages of benzene from Asia to the US to coincide with summer season demands. Jet (Kerosene) and Dubai crack spread (IK/DB) in Q2/2019 averaged at 12.19 $/BBL, a decrease of 3.09 $/BBL