million or 5.89%, due to investment in new warehouse construction and installation of new machine, including cold repair furnace A. Total Liabilities As of 31 December 2018, total liabilities presented at
Cost on Setting up Manufacturing Plant, Warehouse and Office Building 209.46 14.38 3. Machine and Equipment 960.51 65.95 4. Transportation (Truck, Crane, Combilift, Forklift) 43.70 3.00 5. Financing Cost
million) Initial Cost (percent) 1. Land and land improvement 105.91 7.27 2. Construction Cost on Setting up Manufacturing Plant, Warehouse and Office Building 209.46 14.38 3. Machine and Equipment 960.51
to notify the stock Exchange of Thailand that the Board of Directors meeting on 2/2018 held on March 14, 2018 resolved to approve the Company to enter into the transaction of purchase the machine with
machine with PAE PACK Co.,Ltd. (“PAE PACK”) who is Director and Authorized Director of PAE PACK, Mr. Veerachart Losiri, also holds the position of Director and Authorized Director of VAVA PACK Co.,Ltd
warehouse and office building and to purchase hemodialysis machine), and other current liabilities as increase Baht 4.27 million, so these results net increase in operating liabilities. Statement of Financial
) hemodialysis machine ("Hemodialysis Center"). Currently, there are 4 Hemodialysis Center (with 55 dialysis machines), 1 hemodialysis center in Bangkok, 2 hemodialysis centers in northeastern and 1 hemodialysis
Public Company "VNG" would like to disclose the connected transaction for renting of warehouse between Woodtek International Co., Ltd. (a subsidiary which VNG hold 99.97% of the paid-up shares) and
Company "VNG" would like to disclose the connected transaction for renting of warehouse between Woodtek International Co., Ltd. (a subsidiary which VNG hold 99.97% of the paid-up shares) and Firstwood Co
Public Company "VNG" would like to disclose the connected transaction for renting of warehouse between Woodtek International Co., Ltd. (a subsidiary which VNG hold 99.97% of the paid-up shares) and