. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is fully completed, and continually to
including exterior and interior decoration. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is
% 5,535.2 6,620.6* 1,085.4 19.6% Normalized Net Profit/3 523.8 938.3* 414.6 79.2% 1,128.2 1,279.0* 150.7 13.4% /1 Including other income and share of profit from investments in associates and JVs /2 Gross
level close to its previous rate since early July 2019. Share of profit from the geothermal power plant in Indonesia was THB 107 million, attributed to share of profit from operation THB 199 million
expenses 71.35 64.90 6.45 9.94% Net profit 344.32 305.36 38.96 12.76% Net profit attributable to owner of the parent 341.71 302.67 39.04 12.90% Earnings per share (EPS) 0.21 0.18 0.02 12.90% Note: 1) Revenue
sectors, consumption and investment continued to recover, though not yet at broad-based level. Domestic consumption recovered in the durable goods section especially in the vehicles and service sector from
, consumption and investment continued to recover, though not yet at broad-based level. Domestic consumption recovered in the durable goods section especially in the vehicles and service sector from tourism
in the export and tourism sectors 3) Low level of inflation - impacting manufacturers ability to determine pricing and 4) Strengthening of the Thai Baht - 6.7% against the US Dollar since the beginning
in the export and tourism sectors 3) Low level of inflation - impacting manufacturers ability to determine pricing and 4) Strengthening of the Thai Baht - 6.7% against the US Dollar since the beginning
attributable to owners of the Company 2,412 2,084 993 -59% -52% 2,681 3,076 15% Basic earnings per share (Baht) 1.75 1.51 0.72 1.95 2.23 Note: 1/ EBITDA from Refinery Business of the Company, BCP Trading Pte