to be continuously trained and developed their skills. This resulted in the production cost in the first period remained high. When reaching the optimum level and the installation of some machines is
(Decreased) Percentage Remark Sales and Services Income 2,277.55 1,925.12 352.43 18.31% - LPG Trading 773.68 773.35 0.33 0.04% 1 - Transportation 15.98 12.01 3.97 33.06% 2 - Conversion Kit Installation 4.62
product. Moreover, the company’s factory area is not enough for the installation of the new machinery, therefore, it is necessary to choose the location of the factory building and the office that made this
contracts as Subcontractor such BangPa-Kong LNG Terminal Phase 3 project (Design, manufacture, and installation of liquid gas storage tanks) the contract value of 204.12 Million Baht, and Olefins
Baht 100 per share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total
period last year, which was driven by SSSG of 6.8% in our hardline retailing in Thailand category, and the introduction of new merchandise and the installation of in-store amenities such as air
Sales and Services Income 720.81 766.32 (45.51) (5.94%) - LPG Trading 108.72 188.21 (79.49) (42.23%) 1 - Transportation 3.90 3.70 0.20 5.41% - Conversion Kit Installation 0.34 0.62 (0.28) (45.16
installation of the new machinery, therefore, it is necessary to choose the location of the factory that made this transaction at the same place as the machinery location. In Bangpoo Industrial Estate is a
operating cost was driven mainly by the well-managed utility costs and CPN’s proactive energy savings implementation such as installation of Solar rooftop and innovative utility saving technologies and
only 18 days). However, income tax expenses in Q1/2020 increased as a result of the increase in deferred income tax expenses following the implementation of Thai Financial Reporting Standard regarding