Company Limited, has already completed the construction of buildings and set up all equipment. Depreciation has to be fully recognized. Revenue recognized in the second quarter was not enough to cover such
improved the work processes of setting up machinery and manage stock for more efficient production and sales of electricity in the long run. 3. The company’s selling and administrative expenses for this
the Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order issued by the Court, Saraburi is considered to be
has approved for the investment in Eco Energy Group Corporation Co., Ltd. (“Eco”) in the proportion of 76.92 percent as an operator to produce and sell electricity from all renewable energy. The
impairment loss on top-up kiosks and related equipment of Mindmap Commtech Inc. Analysis of revenues EMS business In 3Q17, the Group generates revenue of Baht 651 million from EMS business, which is increased
purchasing raw water from private source. However, the company was able to save the electricity cost by 61.83 million Baht because the company has stopped transferring water from Nongplalai reservoir to
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
Rapid Transit Authority of Thailand (“MRTA”) under the MRT Blue Line Concession Agreement on March 31, 2017, under which the Company has the duties to design, supply, install, test the M&E Equipment, and
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
Mn THB Mn % THB Mn THB Mn THB Mn % Sales of electricity - FiT, base tariff and Ft 806.7 821.3 774.5 848.4 73.9 9.5% 3,146.3 3,250.9 104.6 3.3% FiT Premium 19.6 19.1 15.0 15.2 0.2 1.3% 90.7 68.9 (21.8