by holding percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan by holding 51% of total shares of the project and later this project was
Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical
230.4 15.4 820.5 90.2 Selling and distribution expenses 69.0 73.7 56.9 (4.7) (6.4) 12.1 21.3 Administrative expenses 81.4 79.5 125.6 1.9 2.4 (44.2) (35.2) Revenues and Costs of Sales and Services The
biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of tota l shares by SAFE. The Company could start
power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of total shares by SAFE. The Company could start gaining
products by our own manufacture 1/ 1,431 1,290 (141) (9.9) Branded products by 3 rd party's manufacture 2/ 202 237 35 17.3 3 rd party's products for distribution 146 269 123 84.7 Domestic sales 1,778 1,795
operate the project and has profit as agreed during the period of agreement after Phase 2-4 start to operate water distribution. HECH would purchase more GS’s share in the future from exisiting shareholder
1,417.3 153.8 9.4 377.5 26.6 Rental income from equipment for lease 69.7 55.2 58.1 14.5 26.3 11.6 20.0 Cost of sales and service 1,436.4 1,366.0 1,203.1 70.4 5.2 233.3 19.4 Selling and distribution expenses
Sales and Services Income 720.81 766.32 (45.51) (5.94%) - LPG Trading 108.72 188.21 (79.49) (42.23%) 1 - Transportation 3.90 3.70 0.20 5.41% - Conversion Kit Installation 0.34 0.62 (0.28) (45.16
manufacture and distribution of High Density Polyethylene (HDPE) pipe and related certain fittings, Low Density Polyethylene (LDPE) pipe, Polypropylene (PP) pipe, Polybutylene (PB) pipe, Weholite Spiro pipe