Industrial Estate (“MIE”) with 660 MW of electrical generating capacity; 4.1.4 Glow Energy cogeneration plants (Phase 1&2) located in the MIE with 281 MW of electrical generating capacity; 550 tons per hour of
Industrial Estate (“MIE”) with 660 MW of electrical generating capacity; 4.1.4 Glow Energy cogeneration plants (Phase 1&2) located in the MIE with 281 MW of electrical generating capacity; 550 tons per hour of
; 4.1.3 GHECO-One plant located in the Map Ta Phut Industrial Estate (“MIE”) with 660 MW of electrical generating capacity; 4.1.4 Glow Energy cogeneration plants (Phase 1&2) located in the MIE with 281 MW
. The other project was the property project for investment in the rental market i.e. Lumpini Township Rangsit-Khlong 1 Phase 3 (Building F). Around 80% of condominium units in three buildings was already
, together with lower revenues from matured branches from the slowdown in the country’s economic conditions and competitive landscape in the industry. However, revenues from branches in the ramp-up phase
(KBANK) Lieutenant Commander NALINEE PAIBOON Reporter Common Share 04/01/2023 10,000 151.50 Purchase Link KASIKORNBANK PUBLIC COMPANY LIMITED (KBANK) Miss SUJITPAN LAMSAM Reporter Common Share 26/10/2020
(YGG) Mr. SAROOT TUBLOY Reporter Warrant 10/01/2023 12,364,182 0.50 Sale Link YGGDRAZIL GROUP PUBLIC COMPANY LIMITED (YGG) Mr. TANAT JUWIWAT Reporter Common Share 12/01/2021 12,100,000 12.70 Sale Link
LIMITED (CWT) Mr. WEERAPON CHAITEERATH Reporter Warrant 25/12/2020 11,437,490 - Transfer Link CHAI WATANA TANNERY GROUP PUBLIC COMPANY LIMITED (CWT) Mr. WEERAPON CHAITEERATH Reporter Warrant 26/01/2021
(YGG) Mr. SAROOT TUBLOY Reporter Warrant 10/01/2023 12,364,182 0.50 Sale Link YGGDRAZIL GROUP PUBLIC COMPANY LIMITED (YGG) Mr. TANAT JUWIWAT Reporter Common Share 12/01/2021 12,100,000 12.70 Sale Link
ดา ชิตเชื้อ ผู้รายงาน หุ้นสามัญ 30/10/2562 100,000 2.18 ซื้อ Link ฟอร์จูนพาร์ท อินดัสตรี้ จำกัด (มหาชน) บมจ.(FPI) นางสาว ศรุดา ชิตเชื้อ ผู้รายงาน หุ้นสามัญ 30/10/2562 200 2.26 ขาย Link ฟอร์จูนพาร์ท อิน