2,250 4.23 Sale Link ADVANCED INFORMATION TECHNOLOGY PUBLIC COMPANY LIMITED (AIT) Mr. SIRIPONG OONTORNPAN Reporter Warrant 19/01/2022 26,883,062 - Transfer Link ADVANCED INFORMATION TECHNOLOGY PUBLIC
collection period (days) for FY23 was 52 days. Significant Events in FY23 • Advanced Wireless Network Company Limited (“AWN”) entered into an agreement to accept a transfer of the license of 700 MHz spectrum
High-value Transfer Network: BAHTNET) ระบบโครงสร้างพืน้ฐานเทคโนโลยี (Technology Infrastructure) และศนูย์ปฏิบตัิการคอมพิวเตอร์ (Data Center) ติดตัง้ระบบป้องกันการร่ัว หลของข้อมูลที่ ด้มาตรฐานสากลให้
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
achieved strong earnings, a growth of 49% in core EBIDTA or $749 mil- lion which is on track to deliver over $1 Billion in annual EBITDA in 2017, the first time in the history of the Company. The strong
with sustainable growth. Projects under construction are on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 50.7% current construction progress which is on process
วิธี fast track ได้ อย่างไรก็ดี กรณีที่เป็นการแก้ไขเพิ่มเติมโครงการฯ ให้เป็นไปตามหลักเกณฑ์ใหม่ในข้อ 2.2 เรื่อง อัตราส่วนการลงทุนในกองทุนรวมโครงสร้างพื้นฐาน และกองทุนรวมอสังหาริมทรัพย์/REITs และข้อ 2.3
licenses for water supply business. GS owned reservoir land and licenses about Notification of excavation or land reclamation, Construction license of plant at Pangha and Piping Permit to transfer water
represented the value mutually agreed between a subsidiary and an associate, in accordance with the debt restructuring and transfer agreement. Such value was appraised by an independent appraiser. However, in
. After the company paid for the land, and transfer of ownership of the land for the construction of third factory, was approved to Mrs. Su, Ming – Fen Chairman the Board of Directors has the power to