IEC through the transactions related to the outsourcing contract with Thai-Chin Engineering & Construction where Mr. Rattanathorn Shinkrajangkij and Ms. Yadapat Shinkrajangkij were directors. The
misappropriating money of IEC through the transactions related to the outsourcing contract with Thai-Chin Engineering & Construction where Mr. Rattanathorn Shinkrajangkij and Ms. Yadapat Shinkrajangkij were
no. 131527 Kalong Sub-district, Muang Samut Sakhon District, Samut Sakhon, total land area of 93 rai 3 ngan 61 square wah (37,561 square wah), together with building as per construction permission No
construction permission No. 196/2537, total utilized area of 36,964 square meters at the price of Baht 550,000,000 (Five hundred fifty million) (“Land and Buildings of Subsidiary company”), which is in
Bangkok, June 8, 2016 ? The SEC is urging the shareholders of Vintage Engineering Public Company Limited (VTE) to study the proposed contract on the construction of a solar power plant for GEP
for design and construction to related person. (update) 16/01/2020 20:14 Notification of the Resolution of the BOD Meeting regarding of the schedule of EGM1/2020, Capital increase, an Increasing of
on the dept cost structure analysis for the investment in the biogas power plant project of Aukkrarawat that the Board of Directors has considered additional facts and the study of the change in cost
on the dept cost structure analysis for the investment in the biogas power plant project of Aukkrarawat that the Board of Directors has considered additional facts and the study of the change in cost
661 6664-5 www.indoramaventures.com Ref.No.IVL005/03/2020 19th March 2020 President The Stock Exchange of Thailand Subject: Update on the construction of the integrated PTA-PET assets in Corpus Christi
consolidated sales and services income excluding construction revenue under concession agreement of 3,075.80 million Baht, decreased by 186.46 million Baht or 5.72%) and Net profit attributable to Equity holders