). This was mainly contributed by the performance of “Fit Fast Firm” project, which drove down raw material and packaging costs (sugar, cullet, and other packaging materials), optimized product formulation
increase in Ft rate. Q3/2018 Financial and Operating Highlights * ไม่รวมต้นทุนค่าเสื่อมราคาและค่าตัดจ าหน่าย Operating highlight in Q3/2018 Q3/17 Q2/18 Q3/18 Change +/(-) 9M/17 9M/18 Change +/(-) (THB
attributable to owner of the Company 1,364.84 1,680.53 (315.69) (18.8) 5,058.41 4,938.99 119.42 2.4 * excluding fuel cost Increase (Decrease ) % Increase (Decrease ) % Quarter 3 Quarter 1-3 The operating result
Part 4: Financial position and operating results 13. Significant financial information 14. Financial position and operating results of REIT 15. Trustee’s opinions on REIT’s performance Part 5
Baht 1,591 million, an increase of 1% from Baht 1,575 million as at 31 December 2016, as a result of operating profit during the year. 5. Liquidity and Capital Resources Current Ratio As at 30 June 2017
was no gas turbine maintenance at Rayong Central Utilities Plant in Q3/2017 as there was in Q3/2016 and the plant had better operating performance. Also, the selling price rose from the increase in the
increase in FT rate and the increase in electricity and steam sales after maintenance shutdown of customers of Rayong Central Utility Plants in Q2/2017. Q2/2018 Financial and Operating Highlights * ไม่รวม
robust Fit Fast Firm project (OSP’s cost saving program), which continued to drive further margin improvement through product formulation optimization, lower key raw material prices, higher supply chain
contributed by the performance of “Fit Fast Firm” projects e.g. lower cullet costs, new formulation, lower sugar costs and light-weight bottle, however, somewhat offset by cost increase from natural gas. - The
an opinion on audit reports; 2.2 being affiliated with an audit firm that has an audit quality control system and the required number of personnel; 2.3 meeting other requirements, e.x., not having