50,000 55.75 Transfer Link KCE ELECTRONICS PUBLIC COMPANY LIMITED (KCE) Mr. PAITOON TAVEEBHOL Reporter Common Share 11/03/2022 17,322 Revoked by Reporter - Transfer Link KCE ELECTRONICS PUBLIC COMPANY
LIMITED (VIBHA) Miss RUKKAGEE KANJANAPITAK Reporter Common Share 12/06/2023 2,610,833 - Acceptance of Transfer Link VIBHAVADI MEDICAL CENTER PUBLIC COMPANY LIMITED (VIBHA) Miss RUKKAGEE KANJANAPITAK
154,821,837 - Transfer Link RATCHTHANI LEASING PUBLIC COMPANY LIMITED (THANI) Mr. JATURAPAT NUDAENG Reporter Common Share 08/03/2021 750,000 4.16 Sale Link RATCHTHANI LEASING PUBLIC COMPANY LIMITED (THANI) Mr
and both of them are also test run. 10 Total 70 6 Audited Consolidated Financial Statement of IGEN Engineering Company Limited Consolidated Financial Statements of IGEN Engineering Co., Ltd. IGEN
and targeted to lead to $350 million in run-rate cost savings by 2023. These initiatives and the strategic acquisition of the Huntsman Integrated Ethylene and Propylene Oxide (EO & PO) assets (code
3Q 4Q 1Q Business Design Building Construction including M&E Park Decorations Technical Systems in Production Equipment Used in Production Lights & Electronics Installation Producton Test-run Open for
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
company could only realize the total sales volume from methyl ester plant 1 because methyl ester plant 2 was under testing run for commercial operation. (4) In 2Q/2019, GGC noticed the commercial operating
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has