households. These drivers combined to support growth momentum and helped offset the still lingered at a low level of private investment and contracted in public spending. As the momentum from the above
comprise 3 office buildings (aggregate occupancy rate at 93%), which includes 2 office buildings transferred to GLAND Office Leasehold Real Estate Investment Trust (“GLANDRT”), as well as 1 residential
Personal loan 8,132 3.1 7,993 3.4 1.7 Micro SMEs loan 7,741 3.0 7,954 3.3 (2.7) Housing loan 24,234 9.4 21,663 9.1 11.9 Commercial Lending 59,766 23.1 60,899 25.6 (1.9) Real Estate Development loan 30,738
Commonwealth of Australia. The project cost is approximately AUD 359 million. It started the construction in 2019 and is anticipated to commence operations in 2021. 1.3 The Progress of Riau Combined-Cycle Power
FINANCIAL POSITION PROGRESS OF PROJECTS UNDER CONSTRUCTION 11 Amata B.Grimm Power (Rayong) 4 Type of Fuel Combined Cycle Cogeneration Installed Capacity Electricity 133 MW / Steam 30 t/h Economic Ownership
combined cycle cogeneration power that commenced COD on June 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
of consideration basis, calculated from the Company’s reviewed consolidated financial statements for 6-month period as of 30 June 2018. Therefore, the entering of transaction when combined with the
increase in yield on earning assets in all categories, combined with an increase in average loan volume. Consequently, interest income rose by Baht 2,329 million which was attributable to interest income
as two separate line items in the audited financial statements for the years ended 31 December, 2016, 2017 and 2018, but are reclassified to be presented as a combined line item, “ interest income from
12.29 million, the Company therefore had profit of THB 11.33 million and combined with other income of total THB 28.24 million, the Company had profit before expenses of THB 39.57 million and when