products. Regarding the selection of contractors, the management of Carnival Magic have contacted severals contractors, both local and abroad. Since the design of the Hydraulic Platform as required by
company operation were design, manufacture, assembling of refueling vehicles and aircraft service equipment. Currently, the payment of shares, Bt54.0 million, was already paid and 2) BPTG Company Limited
company operation were design, manufacture, assembling of refueling vehicles and aircraft service equipment. Currently, the payment of shares, Bt54.0 million, was already paid and 2) BPTG Company Limited
and revision of construction design which resulted in project ceased and delayed. However, the problems have been solved during the second quarter of 2020. Many projects are able to start their
. Adaptation of Product Design to the New Normal in Post-Pandemic Adoption of IFRS 16 “ Leases” starting 1 January 2020 The adoption of accounting standard (IFRS 16: Leases) has been effective as from January
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
chart Details relating to CAZ Nature of business: Oil and Gas Construction Company (Engineering Procurement Construction) including Engineering Design, Fabrication, Civil and Erection work with project
chart Details relating to CAZ Nature of business: Oil and Gas Construction Company (Engineering Procurement Construction) including Engineering Design, Fabrication, Civil and Erection work with project
Rapid Transit Authority of Thailand (“MRTA”) under the MRT Blue Line Concession Agreement on March 31, 2017, under which the Company has the duties to design, supply, install, test the M&E Equipment, and
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which