บันทึกรายงานการประชุมกรรมการ 5ส ครั้งที่ 01/2551 Eureka Design Public Co., Ltd. 19 Moo 11 Tambon Ladsavai, Amphur Lamlukka, Pathumthani 12150, Thailand, www.eurekadesign.co.th Tel: +66(0)2-192-3737
loss of revenue recognition from design engineering. 2. Cost of contract work In the first quarter of 2019, the Company and its subsidiaries had cost of contract work amount of 120.28 million Baht, the
deferred income from design engineering works. 2. Cost of contract work In the first quarter of 2019, the Company and its subsidiaries had cost of contract work amount of 120.28 million Baht, the ratio of
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
, increased from Q2/2018 the company’s income from energy business was Baht 53.18 million. As the subsidiary company produces electricity at full capacity. 1.3 The company’s income from design and distribution
and utilities, roads, water systems, electricity and recreation in this large area. (Which is under construction and design) to become a tourist center. There will be land and utilities development by
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
necessary to let Mitsubishi Electric Corporation – Nakatsugawa (MELNAKA), who design and develops mold by buying through MT. 4) Total value of the transaction Total amount Baht 19,490,223 Baht (1 Yen
The company’s income from energy business in Q1/2020 was Baht 82.41 million, increased from Q1/2019 the company’s income from energy business was Baht 84.87 million. 1.3 The company’s income from design
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System