process including sourcing new types of potential feedstocks which has been studied and researched well. However, fuel materials cost of Natural Gas Power Plant increased by Baht 108.5 million or 8.7
potential feedstocks which has been studied and researched well. However, fuel materials cost of Natural Gas Power Plant increased by Baht 112.9 million or 12.4 percent because of increase in natural gas
process including sourcing new types of potential feedstocks which has been studied and researched well. However, fuel materials cost of Natural Gas Power Plant increased by Baht 108.5 million or 8.7
potential feedstocks which has been studied and researched well. However, fuel materials cost of Natural Gas Power Plant increased by Baht 112.9 million or 12.4 percent because of increase in natural gas
building is in the process of negotiations with potential new tenants after its 3rd floor was occupied in 4Q 2019. The other office buildings including Gracechurch (London) and Noble Comm. Bldg; remained
1 with reduced operating hours and restricted working days. From the 17th of May every store in Thailand was reopened, although with limited operating hours, in accordance with the second phase of the
1 1Q21 MD&A Advanced Info Service Plc. Executive Summary Mobile revenue slightly recovered QoQ following strong acquisition and government stimulus In late 4Q20, the new phase of outbreak had re
statement that a unitholder’s expression of the intention to buy or invest in investment units of the mutual fund under the fund scheme, at any phase of ownership, shall be considered acceptance to be bound
connected transaction relating to assets or service, by purchasing of machine for the phase 2 of the flexible packaging. The total value is 18,276,224.79 baht (including vat) or equivalent to 2.74 0f the net
the connected transaction relating to assets or service, by purchasing of machine for the phase 2 of the flexible packaging. The total value is 18,276,224.79 baht (including vat) or equivalent to 2.74