significantly by 222.5% YoY to THB 1,481mn, predominantly due to the consolidation of the acquired hotel business in Europe (Vienna House), the improving operating performance of our hotels in Thailand and the
consideration and feasibility study of branch development SET shall be further informed if the conclusion was done. 4 In case decide for earliest branch development: Franchise period is 2018-2029 In case decide
informed if the conclusion was done. 4 Franchise period when HHC decided to operate the branches In case decide to earliest operate: Franchise period is 2018-2029 In case decide to latest operate
the Meeting of the Board of Directors No. 13/2018 on November 30, 2018 was done with due care. During such consideration and approval, the Company has considered it to be proper for the Company to
Excavation 3 Soil and Coal Milling Project at Mae Moh Mine, Contract No.6 decreased. Due to heavy rain in the project area, the operation could not be done at full capacity resulting in the loss from regular
or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related parties. ** Pursuant to Section 59 of the
necessary or do not keep pace with situations or remain obstacles to livelihoods or engagement in occupations will be abolished or revised to lessen burdens on people. By doing so, methods used must be done
abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related parties.
obstacles to living or occupations will be abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation from all related
engagement in occupations will be abolished or revised to lessen burdens on people. By doing so, methods used must be done with speed, transparency and low costs with participation of all related parties.