comparative performance of the second quarter of 2019 and the second quarter of 2018; Table: Operating Results (Unit: Million Baht) Items Quarter Variance Quarter Variance For six-month periods Variance 2/2019
performance are comparative performance of the second quarter of 2018 and the second quarter of 2017; Table: Operating Results (Unit: Million Baht) Items Quarter Variance Quarter Variance For six-month periods
6 December 2007 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654
performance are comparative performance of the second quarter of 2018 and the second quarter of 2017; Table: Operating Results (Unit: Million Baht) Items Quarter Variance Quarter Variance For six-month periods
2,253.8 2,275.0 6,818.1 6,828.6 121.9 140.6 146.4 358.7 413.2 2,347.0 2,394.4 2,421.5 7,176.8 7,241.8 Q3/18 Q2/19 Q3/19 9M/18 9M/19 +0.9% YoY +1.1% QoQ +3.2% YoY Unit: THB Million, % 1. Operating Revenue
no cost and at a ratio of 2 newly issued preferred shares to 1 unit of the U-W3 Warrants where key details on the U-W3 Warrants are as shown in the Key Features of Warrants to Purchase Ordinary Shares
. May 2017 o The Bangchak refinery temporarily shut down the Hydrogen Production Unit and the Hydrocracking unit, ensuring maximum safety, coinciding with refining strategy and the company’s new product
. Executive Summary Operating Highlights in Q1/2019 1 Q1/18 Q4/18 Q1/19 Changes +/(-) (Unit: Million Baht) QoQ YoY Operating revenue 5,743 5,863 9,067 55% 58% Gross Profit 1,648 1,265 2,493 97% 51% EBITDA 1,483
reported is d ifferent from that reported in the previous period. Operating Highlights in Q1/2020 Q1/19 Q4/19 Q1/20 Change +/(-) (Unit: Million Baht) QoQ YoY Operating revenue 9,067 18,279 18,308 0% 102
slightly decrease of the fuel adjustment charge (Ft) for the collection of September - December 2020 of 0.83 Satang/unit resulting in the Ft of -12.43 Satang/unit. Besides, the GPSC has been closely