Baht 987.27 million, an increase of Baht 56.39 million or 6.06%, which was a decrease of revenue from printing business at Baht 17.04 million or 3.83% and an increase of revenue from power plant at Baht
revenue from power plant at Baht 73.43 million, or 15.11%. The increase of revenue from power plant comes from the 10 MW Kurihara Phase 1 Power Plant on October 1, 2018 at Baht 26.26 million and the revenue
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company
in a complete stoppage of the plant. Using this opportunity, the Company preponed its Annual Maintenance Shutdown, which was earlier planned for May, 2019, by working strategically to align all
7.43 (5.25) 4. Other issues On 7 July 2017, TRIS Rating affirmed the company rating and senior unsecured debenture rating of Eastern Water Resources Development and Management PLC at “A+” with “stable
, plant and equipment due to kiln 7 being activated and the additional assets from the Saraburi Quicklime acquisition. On the liabilities side while the short-term borrowing facility is stable an increase
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA