Hua-Hin during this current quarter Gross profit margin at 38.1% which increased by 3.8% compared with the same quarter of the previous year due to • The average selling price per square meter of unit
Service Charge : Factory area 625 square meters with monthly rental fee of 150 THB per square meter Lease Term : period : September 23, 2020 – July 31, 2021 Payment : Monthly Rental Fee for factory area
the Company in the long term. Page 6 4. Description of Asset to be Acquired 4.1) General Information The manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter
manufacturing plant of MDF Board has a capacity of 652 cubic meter per day or 195,600 cubic meter per year, located in Yi-ngor district, Narathiwat Province, near the raw material resource in 3 southern border
use water more efficiently, and jointly set a demand reduction of 10% during the drought 2. Control water withdrawal from Dokkrai and Nongplalai Reservoirs to not exceed 600,000 cubic meter per day (CMD
to not exceed 600,000 cubic meter per day (CMD) to maintain the water level in the reservoirs above the dead storage 3. Transfer water from Prasae Reservoir to Nongplalai and Klongyai Reservoirs
เม้นท์ จ ากดั (APM) - หน้า 12 - area temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023/8809 dated December 17
in 2017 already. Thus, there was just small progress can be realized in 2018. This resulted in decrease in gross profit for Baht (53.23) million. 2. Management Service (“MS”) had a decrease in gross
quarter lower than the margin recorded in the same period of last year. For the fourth quarter, MK planned to launch 4 new housing projects. The Thai government had just announced the housing stimulus
and production had increased as well. But production stumbled again by the end of the year, and we are now just seeing signs for recovery in end of February 2020, for which production is expected to