Court ordered Saraburi Coal Company Limited (“Saraburi”) into final receivership. The Company and Saraburi are the parties to a joint venture agreement, NWR-SBCC Joint Venture, to carry out a soil and
Saraburi Coal Company Limited (“Saraburi”) into final receivership. The Company and Saraburi are the parties to a joint venture agreement, NWR-SBCC Joint Venture, to carry out a soil and coal extraction and
final receivership. The Company and Saraburi are the parties to a joint venture agreement, NWR-SBCC Joint Venture, to carry out a soil and coal extraction and transportation work project at Mae Moh mine
operations of the Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate
agreement 99.2 102.3 3.1 3.1% Cost of sales and services (874.7) (1,149.4) 274.7 31.4% Gross profit 439.4 471.6 32.2 7.3% Net gain (loss) on exchange rate 55.1 (4.6) (59.7) N.A.(
subsidiary was temporary shutdown in Q1/2019. The company shutdown from February to April after GJ Steel terminate service tolling agreement on 31 January 19 because the company waiting for sign new loan
Agreement which is a Connected Transaction, Appointment of the Independent Financial Advisor and Calling the Extraordinary General Meeting of Shareholders No. 2/2019 (Amended No.2) To The President The Stock
resumed own production since May 2019 after Termination of Tolling Agreement by GJ Steel Public Company Limited in February 2019. The Company reported a net profit of Baht 3,345 million compared to loss of
government measures to control the epidemic situation of COVID– 19. Consequently, the customers change the method of work, resulting in delays in delivery or inspection of equipment or operations. As the
” means: (1) system assets, i.e., computer network, system software, application software, and information systems; (2) equipment assets, i.e., computers, equipment, data recorders, and other equipment; (3