ในสัญญา (“Trigger event”) รวมถึงความเส่ียงจากการก าหนดราคาแปลงสภาพขั้นต ่า (“floor conversion price”) กรณีท่ีเป็นตราสารดอ้ยสิทธิ เพื่อนบัเป็นเงินกองทุนของธนาคารพาณิชย ์(“ตราสาร Basel III”) ท่ีมีเง่ือน
c/o Goldman Sachs (Asia) L.L.C. 68th Floor, Cheung Kong Center, 2 Queen’s Road, Central, Hong Kong List of Shareholders : The Goldman Sachs Group Inc., indirect shareholders holding 100 percent of
leak-detecting system. · In a case where level of floor or computer centre has lifted for the purpose of instalment the air conditioner system, including instalment electric system and network system
level of floor or computer centre has lifted for the purpose of instalment the air conditioner system, including instalment electric system and network system below, it shall install water leak sensor in
-2222 แฟ็งซ์ (66) 02-634-4114 Head Office: 88 PASO Tower, 18th Floor, Silom Road, Suriyawong, Bangrak, Bangkok 10500, Thailand Tel: (66) 02-634-2222 Fax: (66) 02-634-4114 โราาำนั : 55 ญมู 5 สวนัอุตสำญงรรม
. 1858/121-122, 1858/125-128 28th, 30th, 31st Floor, Debaratna Road, Bangna-Tai Sub-District, Bangna District, Bangkok 10260 Tel: 0-2-338-3333 Call Center: 0-2338-3000 Fax: 0-2338-3334 www.nationgroup.com
and total usable floor area of 9,000 square meters, on 6-3-5.4 Rai plots of Land. This expansion of Wattanapat Samui Hospital causing the Company to comply with the disclosure requirement, entitled
Hall 2-3, 2nd Floor Bangkok International Trade and Exhibition Centre (BITEC) address no. 88 Bangna-Trad Road (Km.1), Bangkok 10260, and the authorisation of the Chief Executive Officer and President to
Hall 2-3, 2nd Floor Bangkok International Trade and Exhibition Centre (BITEC) address no. 88 Bangna-Trad Road (Km.1), Bangkok 10260, and the authorisation of the Chief Executive Officer and President to
/2018 on Friday, 24 August 2018 at 14.00 hrs., at Bhiraj Room Hall 2-3, 2nd Floor Bangkok International Trade and Exhibition (Translation) — 4 — Centre (BITEC) address no. 88 Bangna-Trad Road (Km.1