following the market price trend since 2017. Additionally, the increase of electricity cost was also added to higher cost of sales of this year. In spite of rise of main raw material prices and decline in
account from the delayed project Baht 56.85 million had the detailed explanation as follows:- In November 2015, the Company was hired as a contractor to install electricity transmission network with total
joint venture agreement, NWR(SBCC Joint Venture, to carry out a soil and coal extraction and transportation work project at Mae Moh mine, Lam Pang of the Electricity Generating Authority of Thailand
electricity engineering and construction engineering projects. • Inventory has increased Baht 23.72 million. It increased from product in process of trading business, new business of subsidiary, which will be
the end of 2017 was 12 MTHB, decreasing by 119 MTHB comparing to 131 MTHB at the end of 2016. The decrement mostly came from the receipt of 111 MTHB insurance claims receivable from electricity blackout
Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order issued by the Court, Saraburi is considered to be in breached
Mae Moh mine, Lam Pang of the Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order issued by the Court
transportation work project at Mae Moh mine, Lam Pang of the Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order
30% of cost of rent and services) for shopping mall operations, increased from the same period a year earlier due to the continuous rise in electricity Ft rate since May 2017. CPN, meanwhile, achieved
-on-period basis was attributable to the Company having some costs in personnel, doctor fee, drugs and medical supplies, depreciation, electricity charge, medical utensils costs, and medical consumable