borderless marketplace of the ASEAN Economic Community (AEC). Given the increased degree of uncertainty in global economies, especially pressure from a looming trade war among core economies and their
(651.5) (50.3)% Current portion of long-term loans - 29.0 (29.0) (100.0)% Income tax payable - 24.8 (24.8) (100.0)% Provision for penalty on projects delay 90.8 77.1 13.7 17.8% Liabilities under financial
% Current portion of long-term bank borrowings 38.64 38.64 - 0.00% Current portion of finance lease liabilities 9.57 2.45 7.12 290.61% Current income tax payable 0.58 1.35 (0.77) (57.04%) Other current
portion was Baht 65 million) in 2Q2017 In 2Q2017, HuayHo Power generated Baht 15.0 million of Share of Profit to WHAUP SPP In 2Q2017, Gulf JP NLL generated Baht 60.4 million of Share of Profit to WHAUP
portion generating capacity from the renewable energy. It is expected that the new tariff structure will be effective in 2018 which will cause the Ft rate to be zero and there will be the revision of Ft
55,648 million baht at the end of fiscal year 2016 to 60,661 million baht, increasing by 9%. The portion of long-term borrowing was 38,212 million baht or 63% of total borrowings decreased from 71% at the
share with 51% portion. IRPC-CP Phase 1 has already been operated with installed capacity of 45 Megawatt since November 2015. In addition, Phase 2 has been commercialized with installed capacity of 195
Balance Changes 2017 2016 2017 VS 2016 (MB) (MB) % Trade and other payables 1,294.3 630.2 664.1 105.4% Unbilled Payables 459.8 569.8 (110.0) (19.3)% Current portion of long-term loans 29.0 51.4 (22.4) (43.6
Balance Changes 2017 2016 2017 VS 2016 (MB) (MB) % Trade and other payables 1,294.3 630.2 664.1 105.4% Unbilled Payables 459.8 569.8 (110.0) (19.3)% Current portion of long-term loans 29.0 51.4 (22.4) (43.6
) (21.41) Trade and other account payables 21.9 24.14 2.24 10.23 Current portion of long-term borrowings 9.49 14.86 5.37 56.59 Long-term borrowings 18.86 4.00 (14.86) (78.79) Total shareholders' equity