interest was THB 39mn Interim dividend payment of THB 0.012 per share to be paid on 6 September 2019 KEY BUSINESS UPDATE THAILAND MACO has successfully installed 180 Lightboxes and 42 LED Screens of
Company and the Government of the Lao People’s Democratic Republic signed Power Development Agreement for Xe Kong 4A and 4B Hydroelectric Power Project with an installed capacity of approximately 340
big project work. The Company has received order for the big project work totaling Baht 3.67 million, which was installed completely. At present, the Company has received purchase order for installation
. Currently, the 2 production lines are closed for renovate and in process of ordering new machines and expected to be installed in 4Q2020. As for fresh chicken meat, it can be sold to customers for further
holds 20 percent of total shares of GEP. At present, the project has operated commercially the 1st phase with installed capacity 50MW since 27 September 2019. Now the project is on the process of
Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Rooftop Solar Private PPA 100% 20.4 20.4 2Q2020- 4Q2020 Total 20.4 20.4 Please be informed accordingly
-treatment of wastewater project is a joint venture between the company and Otani Company Limited from Japan. As of today, all the machines have been successfully installed since July 2019 and the
pipeline are 26.7 MW which are under construction and scheduled to achieve COD in 3Q2020-1Q2021. Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW
-kW floating solar installed at PTT Tank Terminal Company Limited in Map Ta Phut, Rayong. GPSC, as a power flagship of PTT Group, has commission Combined Heat and Power producing Company Limited (CHPP
new solar 3 power plant, 1 MW installed capacity, in September 2019. As a result, sales of Solar Energy Power Plants for the first quarter of 2020 is higher than 2019. Q1-2020 Q1-2019 THB Mn THB Mn THB