(Translation) Re: BOD.SET 003/2020 February 25, 2020 Subject: Clarification on the Change in operating results for the twelve month ended 31 December 2019 over 20% compared with the same period of
School Name: สารสาสน์วิเทศศึกษา (Translation) Re: BOD.SET 036/2017 November 10, 2017 Subject: Clarification on the Change in operating results for nine month ended September 30, 2017 over 20
(Translation) Re: BOD.SET 011/2019 August 8, 2019 Subject: Clarification on the Change in operating results for the six month ended June 30, 2019 over 20% compared with the same period of the
(Translation) Re: BOD.SET 013/2019 November 12, 2019 Subject: Clarification on the Change in operating results for the nine month ended September 30, 2019 over 20% compared with the same period of
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
December and the fourth quarter of 2019) Performance Analysis Unit : MB Y2019 Y2018 Change MB % Net sales 1,001.58 1,057.38 (55.80) (5.28) Other income 41.40 47.74 (6.34) (13.28) Total revenues 1,042.98
Summary of operations and the factors that make a significant change Summary of Operations for the Year 2021 Annual Balance Change 2021 2020 2021 VS 2020 Million baht (MB) (MB) % Total Revenue 7,034.7
Summary of operations and the factors that make a significant change Summary of Operations for the Year 2021 Annual Balance Change 2021 2020 2021 VS 2020 Million baht (MB) (MB) % Total Revenue 7,034.7