The measures include the Bank of Thailand (BOT)’s permission for financial institutions that have purchased investment units of daily fixed income funds to place such investment units as collateral for liquidity support while financial institutions giving assistance to such mutual funds are allowed to use high-quality domestic instruments as collateral for the same purpose.Concurrently, SEC has announced a measure for temporary liquidity management by allowing asset management companies to...
to remain the stability in raw water distribution system. 3) Maintenance cost increased because of the pipeline moving along the motorway road and the rising in pumping volume. 4) Rising depreciation
a single storey building area 70 square meters for control the pumping of raw water to the water supply station. The buliding located สารสนเทศรายการได้มาซึง่สินทรัพย์ บริษัท บางกอก เดค-คอน จ ากดั
single storey building area 70 square meters for control the pumping of raw water to the water supply station. The buliding located Moo.7 Thai Mueang District, ampher Thai Mueang, Phang Nga Province
. Construction license : - No. 72903/026/2016 dated October 14, 2016 issued by Tai Mueang District Administrative Organization which is a single storey building area 70 square meters for control the pumping of raw
Administrative Organization which is a single storey building area 70 square meters for control the pumping of raw water to the water supply station. The buliding located Moo.7 Thai Mueang District, ampher Thai
, Bangpakong pumping project and Tubma reservoir project; after depreciation and amortization of the completed projects. - Other Non-current assets were 1,004.86 million Baht, rose by 662.29 million Baht mainly
- Property, plant and equipment were 14,434.19 million Baht, increased by 51.96 million Baht mainly from construction in progress including clarified water & total water solution projects, Bangpakong pumping
Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT